Kinrara BK 5 LRT station
3°3′2.0″N 101°38′39.2″E / 3.050556°N 101.644222°E / 3.050556; 101.644222
Preceding station | Following station | |||
---|---|---|---|---|
Alam Sutera towards Sentul Timur | Sri Petaling Line | IOI Puchong Jaya towards Putra Heights |
Kinrara BK5 LRT station is a Light Rapid Transit station in Bandar Kinrara, Puchong, Petaling District, Selangor, Malaysia. It was the southern terminus for passenger services on the LRT Extension Project Phase 1.[1][2]
It is operated under Sri Petaling Line network as found in the station signage. Like most other LRT stations operating in Klang Valley, this station is elevated.
The work of LRT Extension Project (LEP) that was kicked off in the middle of 2013 started from Awan Besar and passes through Kinrara, Puchong, and ended at Putra Heights. The extension is 17.7 km long with 11 new stations and was completed in stages. The first stage of 4 stations was completed in September 2015 and commenced operations on 31 October 2015.
The LEP Phase 2 covering the remaining stations have commenced operations on 30 June 2016.
Station Nearby
- Giant Hypermarket Bandar Kinrara[3]
- Kinrara Oval
References
External links
- Kinrara BK5 LRT Station - KL MRT Line Integrations
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara–Thomson Hospital
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|
This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e